Calculated Runtimes
Calculated Runtimes
Emtron generates a number of “calculated” runtimes that offer a higher level of flexibility for tuning engines.
Efficiency Calculation – Percentage of Engine Efficiency (Commonly used for Fuel Tables)
Load Calculation - Percentage of calculated Load (Commonly used for Ignition Tables)
% MAP/BAP - Manifold Pressure divided by Barometric pressure as a %
% MAP/ExhPress - Manifold Pressure divided by Exhaust Pressure as a %
% TPS/BAP - Throttle Position divided by Barometric Pressure as a %
MAP Modelled - Modelled Manifold Pressure
MAP Modelled/BAP % – Modelled Manifold Pressure divided by Barometric pressure as a %
Air Mass Final (mg/cyl) – Calculated final air mass as milligrams per cylinder
Manifold Pressure Estimate– Estimated Manifold Pressure
Exhaust Pressure Estimate– Estimate Exhaust Pressure
To access Calcualted Runtimes,
- Config, Channels, Calculated Runtimes